Sunday, August 17, 2014

Catching Up S'Mo

To begin...and have some continuity with previous weather posts, the heat wave continues but it looks like there is light and the end of the forecast tunnel. The temperature is in the high 80's today and the forecast for the rest of the week calls for similar temperatures.

It's been waaaay too hot for waaaay too long.

We have finally figured out the next project for the house and in fact, preliminary work has already taken place.

We have begun the remodel of the main floor bathroom.

The work done so far is in the back stair well space that the bathroom will be expanding into. A staircase built to the proper code was built over the original very steep staircase.
Here you can see the space we are expanding into and the two sets of stairs.

The top picture shows the newer staircase and the bottom shows the old original one.
I have removed the newer staircase and am getting ready to open the wall between the stairwell and the bathroom.
We are holding off taking down the wall for two reasons. The main reason is because it is a bearing wall and I'm going to need to consult with my peoples on how to proceed.

The other reason is because we are hosting a party this coming weekend for Susan's friend, Sharron. The plan was that Sharron would be attending this party but she died August 8th from Lung Cancer.

Sharron still wanted the party to take place and she will be there in spirit.

No comments: